Published Miami ranges put a condo renovation at roughly $80 to $350+ per square foot in 2026: about $80 to $150 for a cosmetic refresh, $150 to $250 for a full renovation, and $250 to $350 or more for a full gut with custom finishes.
For a 1,500 square foot unit, that is roughly $120,000 to $525,000 or more in construction, before association deposits, permits, and a 10 to 20 percent contingency.
The association approves the work before the city does. Building rules set the work hours, elevator bookings, and debris handling, and they add time and cost.
Since Surfside, Florida law requires milestone structural inspections and fully funded structural reserves for condo buildings three stories and up. Read the building's reports before you budget, because a special assessment can land in the middle of your renovation.
Exterior windows and doors in Miami-Dade must be approved for the High Velocity Hurricane Zone, and in most towers the association controls what can be installed.
A Miami high-rise condo renovation costs roughly $80 to $350 or more per square foot in 2026, based on published Miami contractor and cost-guide ranges. A cosmetic refresh sits around $80 to $150 per square foot, a full renovation around $150 to $250, and a full gut with custom finishes around $250 to $350 or more. For a 1,500 square foot unit, that is about $120,000 to $525,000 or more in construction, before association deposits, permits, and a 10 to 20 percent contingency.
These per square foot ranges come from published 2026 Miami condo guidance and Miami remodel cost guides (see Sources). They cover construction inside the unit. They do not include association deposits and fees, special assessments, furniture, or appliances beyond the kitchen package. The 1,500 square foot examples are simple multiplication, meant for early planning, not a bid.
Paint, new flooring, lighting, doors and hardware, with plumbing and walls left where they are. About $120,000 to $225,000 for a 1,500 square foot unit. The lowest-risk scope inside a tower, because it rarely needs engineering or extended association review.
A new kitchen and baths, flooring throughout, upgraded lighting and electrical, and new millwork. About $225,000 to $375,000 for 1,500 square feet. Published Miami guidance puts many substantial condo projects in the $120 to $250+ range.
Demolition to the slab and walls, new plumbing and electrical runs, layout changes, custom cabinetry, and stone throughout. About $375,000 to $525,000 or more for 1,500 square feet. Published Miami guidance puts comprehensive gut renovations at roughly $175 to $350+ per square foot.
Design fees are scoped to each project and set out in writing before anything starts.
A per square foot number hides where the money actually lands. These are the line items that drive a Miami condo budget, with the published benchmark for each.
In a Miami tower, the first approval is the association's, not the city's. Most buildings require an application, drawings, the contractor's license and insurance, and a deposit before anyone is allowed upstairs. Moving plumbing, touching the slab, or changing anything tied to the building's systems usually triggers engineering review on top of that.
Read the declaration and the building's renovation rules before design starts. They decide what you control inside the unit, what belongs to the association, and what flooring needs sound underlayment so the neighbor below does not hear every step. They also set when work can happen, how deliveries come in, and who protects the hallways and elevators.
After the Champlain Towers South collapse in Surfside in 2021, Florida rewrote the rules for condo buildings. Two statutes matter to anyone renovating a unit, because they decide what the association must inspect, repair, and fund, and owners pay for all of it.
Milestone inspections (Florida Statute 553.899). Condominium and cooperative buildings three or more habitable stories tall must have a milestone structural inspection by December 31 of the year the building reaches 30 years of occupancy, and every 10 years after that. The local building official may require it at 25 years based on the building's proximity to salt water, which matters on the coast. Phase one is a visual inspection by a licensed architect or engineer, due within 180 days of the notice. If it finds substantial structural deterioration, a phase two inspection follows, and repairs must begin within 365 days of the phase two report. The association must share a summary with unit owners within 45 days.
Structural reserves (Florida Statute 718.112). Buildings three or more stories tall need a structural integrity reserve study at least every 10 years. It covers the roof, structure, fireproofing, plumbing, electrical, waterproofing and exterior painting, and windows and exterior doors, plus other items over $25,000 that affect those elements. For budgets adopted on or after December 31, 2024, owners can no longer vote to waive or reduce reserves for those items. The association can fund them through special assessments, a line of credit, or a loan.
What this means for your budget: before you sign a contract, ask the association for the latest milestone inspection summary, the structural integrity reserve study, and the current budget. A large assessment for structural or window work can arrive mid-renovation, and building-wide repairs can also limit elevator access and work days for everyone.
Miami-Dade and Broward sit in the High Velocity Hurricane Zone of the Florida Building Code, the strictest wind and impact standard in the state. Windows, sliding doors, and storefront systems installed there need a product approval for the zone, most often a Miami-Dade Notice of Acceptance, which documents the large and small missile impact testing the product passed. You can look up any product's approval in the county's Product Control search before you buy.
In a high-rise, windows and exterior doors are usually controlled by the association. The structural integrity reserve study lists them as a reserve item, and many declarations treat them as common or limited common elements. That means the association often decides the system, the color, and the schedule, and some buildings replace them building-wide. Confirm this before you design around a new opening or a larger terrace door.
Salt air and humidity are the materials brief in Miami. What lasts in a dry climate can move, corrode, or stain here within a few seasons.
Your building's rules and the city's noise rules both limit when the work can happen. In Miami Beach, construction in residential districts is allowed on weekdays from 8:00 a.m. to 6:00 p.m. and on Saturdays from 10:00 a.m. to 4:00 p.m., with none on Sundays or national holidays. Many associations are stricter, often allowing about eight working hours, Monday through Friday only, with freight elevator bookings for deliveries and debris.
The schedule runs in phases. Design and drawings come first. The association review follows, then the city permit; published Miami guidance puts residential permit review at about 30 business days. Construction then runs on the building's calendar, not the contractor's. Fewer working hours per week means more weeks on site, which is why a tower renovation takes longer than the same scope in a house.
Published Miami ranges put a condo renovation at roughly $80 to $350 or more per square foot in 2026. A cosmetic refresh runs about $80 to $150 per square foot, a full renovation about $150 to $250, and a full gut with custom finishes about $250 to $350 or more. For a 1,500 square foot unit, that is roughly $120,000 to $525,000 or more, before association fees, permits, and contingency.
Yes. Most Miami condo associations require an application, drawings, the contractor's license and insurance, and a deposit before work starts. Moving plumbing or anything tied to the building's systems usually needs engineering review as well. The city permit comes after or alongside the association's approval.
Florida now requires milestone structural inspections for condo buildings three or more stories tall at 30 years, or 25 years near salt water if the local official requires it, then every 10 years. Associations must also fund structural reserves for items like the roof, structure, plumbing, electrical, and windows, and owners can no longer vote to waive them. Ask for these reports before you budget, because they can lead to special assessments.
Windows and exterior doors installed in Miami-Dade must be approved for the High Velocity Hurricane Zone, usually through a Miami-Dade Notice of Acceptance. In most high-rises the association controls the windows and exterior doors, so the product and schedule are often set by the building, not the owner.
Miami Beach allows construction in residential districts on weekdays from 8:00 a.m. to 6:00 p.m. and on Saturdays from 10:00 a.m. to 4:00 p.m., with none on Sundays or national holidays. Many condo associations are stricter, often limiting work to about eight hours on weekdays.
Plan for design, association review, and the city permit before construction starts. Published Miami guidance puts residential permit review at about 30 business days. Construction then follows the building's work hours and elevator schedule, so the same scope usually takes longer in a tower than in a house.